We’ve been fighting the weather. As you might imagine, we are not big agents of change in that fight. Mostly, the weather is winning. This is not about climate change (though today’s the big march and I wish you all well.) This is about construction.

We have made some great strides in our building—but there hasn’t been any “honeymoon” phase in which we’ve had the opportunity to revel in the progress. No sooner had the last lag been set in the first floor log walls, than the clouds rolled in for days of heavy rain. It’s not like the rain can really damage the cedar logs—but it can wreak havoc on the plywood subfloors, which, so far, are still open to the sky. (Not to mention that it will all drain into the basement, anyway.) So, as soon as the stacking crew packed up, we pulled out the tarps and heavy duty plastic to try to contain the damage. The good news is that we knew this could happen—so we used a deck sealer on the subfloor—which has helped to minimize the absorption.

That first night was crazy—there we were, trying to secure huge tarps in high winds, in the middle of the night. We had some lighting—you couldn’t even hear the generator over the howl of the wind. Finally we worked out a rhythm to the mechanics of it all. By 1:00 am, we’d lashed it down as much as possible, just in time for the rain to hit. Most critically, we’re trying to cover and keep the floor as dry as possible. Each day we (mostly Rick) run out in the dry spells, pull the tarps, sweep out the water (or pump the basement) and then we re-secure it all before the next wave. Last night a squall hit while we were re-tarping. We just climbed under it and waited for it to abate. When inside, Rick is glued to the weather service site—and the radar projections. We no longer have any dry shoes.

Wait, wait, there’s good news! Tomorrow it should clear and give us at least four days in which to get ourselves more battened down. There could be more, but the weather service doesn’t extend its local prognostications to specifics out of that 5 day window. (Though I’ve already seen internet projection for heavier than normal snowfall for 2014/15 season! Sheesh!) We just need to hang in there until we get the roof on—then we can finish from the relative comfort of a weather tight envelope. And having the first floor done is a step in the right direction.

Rick is a builder from California. They don’t build in foul weather in California. I once knew a fence builder in Oakland who’d pack up his truck if the wind picked up on a cloudy day! Here in Michigan, they’re not much for building in driving rain—but you’ll hear them extol the virtues of building in snow! Probably most Michigan builders would laugh at our tarping efforts; what’s a little wet? (Snow is much better for the materials—as long as your equipment will work, why not? One of our stackers was advising Rick that if, in the dead of winter, the oil in your equipment gets too cold, too viscous, you can use transmission fluid instead. I don’t think that he was kidding, but I also I don’t think Rick was contemplating building in sub-zero conditions.)

Yes, we’ve run late in the season—but it’s not yet color (though some trees are turning, harbingers of what’s to come.) There’s still plenty of time to get things “buttoned down” before snow flies. I told my sister if she uses that expression, (buttoned down) one more time, I would button her down. Most of my family is urging us to hire builders. What is it they think we’re doing? Soon we’ll even have power, propane, and even water somewhere on the horizon. (The well-drillers didn’t want to hear from us until all the heavy equipment was finished.)

But then we had to give it a raincoat.

But then we had to give it a raincoat.

In the meantime, we’re meeting lovely people (the stacking crew—the Flanagan brothers were a total hoot.) We’ve even found a couple of reputable suppliers—rare in this industry. We’re moving right along.